Safety Track System

With continuation from the crack injection, following cutting off the High density nylon injection packers and clearing any uneven surface off the foundation wall.  The concrete floor pad will be separated, along leaky foundation wall, and weeping tile is installed under the concrete floor, along with 3/4 crushed gravel to ensure proper drainage.  Dimple membrane fastening the foundation wall, draining into the weeping tile. The joint will be sealed from the existing floor by pouring in new concrete.

 

 

 

 

 

 

 

 

 

 

Dura Proof Waterproofing Company © 2016  All Rights Reserved
Home / Service / Products / Contact Us / About Us